Panelized construction is a way of building homes where the structural walls and roof are manufactured as large, finished panels in a factory, then delivered and assembled on the building site. It sits between traditional stick-built construction and fully modular homes, combining factory precision with the flexibility to build on almost any lot.
What’s inside a BOSS panel
A traditional wall is built in layers by several different trades: framers, insulators, electricians, plumbers and drywallers, each waiting for the one before. A BOSS panel arrives with those layers already combined:
- Galvanized steel framing that won’t rot, warp or attract termites.
- 4″ of continuous PIR insulation, for an R-42 rating in the walls and R-28 in the roof.
- Interior drywall and exterior cement board.
- Rough electrical and plumbing routed inside the panel.
- Weatherproof interlocking edges so panels seal tightly to each other.
The panels are FM Approved Class 1, the highest fire rating for building materials, and the insulation is self-extinguishing. The system is engineered to California and International Building Codes under ICC-ES evaluation report ER-0658, and contains about 35% recycled content.
Step 1: Engineering
Every project starts with engineering. For our ADU models, the panel layouts are already designed; for custom homes and developer projects, we convert approved drawings to the BOSS panel system. The result is a set of panel drawings and a permit package.
Step 2: Manufacturing
Panels are built in our factory in Montebello, California. Working indoors on precise jigs means consistent quality, no weather delays and far less waste than cutting lumber on site. Because manufacturing happens while your site is prepared, two big phases of the project run at the same time.
Step 3: Delivery
Finished panels are stacked on pallets and delivered on a flatbed truck. Unlike modular boxes, panels don’t need oversized loads, street closures or a crane. They can be carried through a side yard into a backyard that a module could never reach.
Step 4: Assembly
Our crew sets the panels on the foundation, connects them, and completes the roof, finishes and utility connections. For a BOSS ADU, on-site assembly typically takes about 2–4 weeks.
Why it matters
- Speed: factory work and site work happen in parallel, cutting weeks or months from a traditional schedule. On developer projects, panelizing a design can reduce on-site construction time and labor by up to 50%.
- Predictability: fewer trades on site means fewer scheduling gaps and change orders.
- Performance: continuous insulation and tight panel joints make homes quieter and more energy efficient.
- Durability: steel and cement board hold up to moisture, pests and fire far better than typical wood framing.
Where panelized construction is used
BOSS uses the same panel system for backyard ADUs, full-size single-family and multi-family homes, and interim housing communities for cities across California. See our house plans, explore our ADU models or book a factory tour to see the panels being built.