BOSS Studio Plus ADU with green siding in a California backyard

For homeowners

A Smarter Way To Build Your ADU

Built in our Montebello factory and installed on your lot in weeks. One team handles design, permits and construction, so you always know what comes next.

1,000+
Homes and units delivered since 2018
15+
Cities across California
~50%
Less time than traditional building
Since 1938
Backed by Harwal Group manufacturing

Add a Home To Your Backyard

Rent it out, move a parent in, or give yourself a quiet place to work. Our steel-panel ADUs are built to last, priced upfront and finished faster than a traditional build.

White BOSS steel-panel ADU with a wood deck in a landscaped California backyardBOSS ADU interior with open kitchen, dining table and living areaBOSS Homes crew installing steel wall panels on a backyard ADU

Why homeowners choose BOSS

An Easier Way To Build in Your Backyard

No year of contractors, surprise costs or a torn-up yard. Here’s what changes when one accountable team builds your home in a factory.

Months, Not a Year

Factory-built panels and fast on-site assembly keep most projects to about 3–6 months from the first call.

Published, Upfront Pricing

Every model has a typical installed price online, and your feasibility study confirms your site cost before you commit.

Built Stronger With Steel

Steel framing and cement board won’t rot, warp or attract termites, and the panels carry a Class 1 fire rating.

Permits Handled for You

We prepare your plans, submit them to your city and manage the approval process for you.

Make It Match Your Home

Choose siding colors, materials and roof style, and place windows and doors to suit your lot.

One Team, Start To Finish

One BOSS team handles design, permits, manufacturing and assembly, backed by a 10-year structural warranty.

See One Inside and Out

A quick look at the BOSS Studio Core, built in our factory and set in a real backyard.

Want To See One in Person?

Walk through a finished display unit at our Montebello factory, check the finishes and see how the panels go together.

Every Step of the Way

Most projects take about 3–6 months from first call to move-in. Your city’s permit review is the biggest variable.

  1. 01Feasibility Study$1,000. Refundable if you don’t move forward, credited if you do.
  2. 02Design & PermitsPick your plan and finishes. We submit and manage the permit.
  3. 03Build & Site PrepYour panels are built in the factory while your foundation goes in.
  4. 04Install & Move InAssembled on your lot in 2–4 weeks, inspected and handed over.
How our panel system works →

“Having my mom nearby was important to us, but the thought of a long construction project was holding us back. It all happened much faster than we expected.”

Julia T. · Riverside, CA

Featured inThe New York Times logoCBS logoBusiness Wire logoGensler logo

Service areas

Building Backyard ADUs Across California

Your home arrives as flat panels on a truck from our Montebello factory, so tight backyards and long drives aren’t a problem.

Los Angeles County

Los Angeles, Long Beach, Pasadena, Glendale, Torrance, Santa Clarita

Orange County

Irvine, Anaheim, Santa Ana, Huntington Beach, Costa Mesa, Tustin

Inland Empire

Riverside, San Bernardino, Ontario, Rancho Cucamonga, Corona, Temecula

San Diego County

San Diego, Chula Vista, Oceanside, Escondido, Carlsbad

Bay Area

San Jose, San Francisco, Oakland, Fremont, Hayward

Sacramento & Central Valley

Sacramento, Fresno, Stockton, Modesto, Bakersfield

Don’t see your city? We build statewide. Send us your address →

Common Questions

Will an ADU Fit on My Lot?

Probably. Our smallest model has a 10’ x 24’ footprint, and California generally allows ADUs 4 feet from side and rear property lines. Your feasibility study confirms exactly what fits.

What Will It Cost?

Typical installed prices start at $99,404, including permit-ready plans, typical site work and installation. Tax, shipping, city fees and site-specific extras are added, and your feasibility study gives you a site-specific cost.

How Long Does It Take?

About 3–6 months from first call to move-in. Your city’s permit review is usually the longest step.

Do You Need Crane Access?

No. Panels arrive on a flatbed and are assembled on site in about 2–4 weeks, so narrow side yards and rear yards work.

Can I Rent It Out?

Yes. Long-term rentals are allowed statewide, but many cities don’t allow stays under 30 days. We’ll confirm your city’s rules.

How Do Most Homeowners Pay for It?

Savings, a home equity loan or line of credit, a cash-out refinance or a construction loan. Our published prices give your lender the numbers it needs.

Questions? Let’s talk

Will an ADU Fit on Your Property?

Send us your address and a few details. We’ll take a first look at your lot, answer your questions and tell you if a feasibility study is the right next step.

  • Free intro call, no obligation
  • $1,000 feasibility study, refundable if you don’t move forward
  • Real answers on size, cost and timeline

Prefer to talk? Call 1-888-634-0338

← Back

Thank you for your response. ✨