Technology

The BOSS Panel System

Our patented steel wall and roof panels arrive with framing, insulation, finishes and rough wiring already built in, so homes go up faster with fewer workers.

BOSS wall panel with integrated framing, insulation and electrical
US Patent 11,840,836
ICC-ES ER-0658
HCD-licensed factory-built housing
Light gauge steel framing
35% recycled content

Why a system

There Are Three Ways To Build

Most homes are still built one trade at a time. BOSS moves the critical work into the factory and turns installation into a repeatable process.

Traditional Jobsite Construction

Built piece by piece on site. Each trade waits on the one before it, so schedules are slow and hard to predict.

Factory-Built Modules

Factory quality, but finished boxes need oversized transport, a crane and a clear path into your yard.

Our approach

The BOSS System

Panels built in our factory, shipped flat and assembled on site without a crane. The quality of prefab with the flexibility of on-site building.

Inside the panel

One Panel Replaces Several Trades

Each wall and roof panel arrives with the work built in and locks into the next on site, so structure, insulation and finishes go up together.

StructureLight gauge galvanized steel framing
Insulation4″ continuous PIR foam, R-42 walls and R-28 roof
FinishesInterior drywall and exterior cement board, ready for any cladding
OpeningsDoors and windows framed into the panel
MEPRough electrical and mechanical routed inside
ConnectionsWeatherproof interlocking panel edges
Standard BOSS wall panel layout drawing
Standard wall panel layout
Standard BOSS roof panel layout drawing
Standard roof panel layout

Panels stay open on the interior so inspectors can check the work before the drywall closes them.

Speed

Faster at Every Stage of the Build

Panels are finished in the factory while your site is prepared, so projects typically take up to 50% less time and labor.

Structure for a Model House

Days to complete the structure

Concrete block150 days
Light gauge steel45 days
Wood frame35 days
BOSS panels12 days

About 3× faster than wood framing

Overall Construction Schedule

Weeks from start to completion

Traditional24 weeks
BOSS system12 weeks

About half the construction time

Crew Size

Workers per 8-hour shift

Traditional12 workers
BOSS system4 workers

One-third of the on-site labor

Performance

Built Stronger, Quieter and More Efficient

A complete insulated steel wall that exceeds code requirements without extra layers.

Light Gauge Steel

Galvanized steel won’t rot, warp or attract termites, and stays straight for the life of the building.

Finish-Ready Exterior

Cement board replaces conventional plastering and takes siding, stone, wood or other finishes.

Thermal & Sound Insulation

Continuous PIR insulation creates an airtight, quiet home with lower heating and cooling costs.

Fire Resistant

FM Approved Class 1 rating, the highest for building materials, with self-extinguishing insulation.

Weather Resistant

Steel and cement board don’t absorb water or moisture, so panels hold up in wet climates.

Code Approved

Engineered to California and International Building Codes, with ICC-ES report ER-0658.

Recycling symbol formed by a forest seen from above

Sustainability

Made With 35% Recycled Plastic

Our insulated panels use plastic waste from bottles and industrial sources, which also improves fire resistance. Less jobsite waste and high insulation make homes efficient to build and to live in.

Delivery model

From Factory to Finished Structure

01

Engineer

Designed around standard panel layouts, or your approved design is converted to the BOSS system.

02

Manufacture

Panels are built in our Montebello factory while your foundation and utilities go in.

03

Ship

Panels travel flat by flatbed truck. No oversized loads, street closures or cranes.

04

Install

A small crew locks the panels together and completes the structure in days.

Technical Questions

What Is a BOSS Panel Made Of?

Light gauge galvanized steel framing, 4″ of continuous PIR insulation, interior drywall and exterior cement board, with rough electrical and mechanical routed inside and interlocking edges that seal to the next panel.

Is the BOSS System Code Approved?

Yes. Panels are engineered to California and International Building Codes under ICC-ES report ER-0658, and BOSS is an HCD-licensed factory-built housing manufacturer.

How Energy Efficient Are BOSS Homes?

Walls are rated R-42 and the roof R-28, creating an airtight building that exceeds code-required insulation values without extra layers.

Can My Own Design Be Built With BOSS Panels?

Often, yes. Our engineering team can convert an approved design to the BOSS panel system and tell you if anything needs to change.

Explore the BOSS System for Your Project

Talk with our team about panel layouts, engineering and timelines for your next build.