There are two main ways to build an ADU: traditional stick-built construction, where framing and systems are built piece by piece in your backyard, and factory-built construction, where major parts of the home are made in a controlled factory and then installed on site. Within factory-built, there are also two very different approaches: finished modules that are craned into place, and panelized systems like BOSS that arrive as flat panels and are assembled on your lot. Here’s how they compare.
Stick-built ADUs
A conventional builder pours the foundation, then frames walls and roof in lumber, installs insulation, runs electrical and plumbing, hangs drywall and finishes the interior, all in your yard.
- Pros: fully custom, familiar to every inspector, works on almost any lot.
- Cons: the longest timeline, exposed to weather and trade scheduling delays, months of noise and crews in your backyard, and costs that can climb as the job goes on.
Modular (volumetric) ADUs
A prefab company builds a complete box in a factory and trucks it to your property, where a crane lifts it onto the foundation.
- Pros: fast on site and built in a controlled environment.
- Cons: the finished module has to fit on a truck, down your street and over your house. Many backyards simply can’t take a crane, and street permits, power line clearances and crane rental add cost and risk.
Panelized ADUs (the BOSS approach)
BOSS builds the wall and roof panels in our Montebello factory with steel framing, insulation, drywall, exterior cement board and rough electrical and plumbing already inside. The panels ship on pallets on a flatbed truck and our crew assembles them on your foundation. No crane is needed.
- Pros: factory quality and speed without the access problems of modules, so narrow side yards and backyard lots work. Your site prep and the panel manufacturing happen at the same time.
- Cons: you still need a foundation and utility work on site, and designs are based on our engineered panel system rather than fully free-form framing.
Side-by-side
Timeline
Stick-built ADUs often take a year or more from design to move-in. With BOSS, most homeowners move in about 3–6 months after the first call, and on-site assembly takes about 2–4 weeks.
Cost certainty
Stick-built projects are usually quoted after design and can change during construction. BOSS publishes a typical installed price for every model, from $99,404 for the Studio Core, and your feasibility study adds your city’s fees and site work before you commit.
Quality and durability
Factory panels are built on jigs in a controlled environment, so walls are square and consistent. BOSS panels use galvanized steel framing and cement board that won’t rot, warp or attract termites, 4″ of continuous PIR insulation for R-42 walls and an R-28 roof, and carry an FM Approved Class 1 fire rating.
Disruption to your household
With stick-built construction, crews are in your yard for months. With BOSS, most of the building happens in the factory, and on-site work is limited to the foundation, utilities and a few weeks of assembly and finishing.
Site access
Stick-built works almost anywhere. Modular units need crane access and a clear delivery route. Panelized BOSS homes arrive in pieces that can be carried through a side yard.
Codes and approvals
All three can be fully permitted. BOSS panels are engineered to California and International Building Codes, with ICC-ES evaluation report ER-0658, and our team prepares and submits your permit package.
Which is right for you?
If you want a completely one-of-a-kind design and time isn’t a concern, stick-built may be the right call. If you want speed and predictable pricing and your lot is easy to reach with a crane, a module can work. If you want factory speed and quality on a typical California backyard, including tight ones, panelized construction is usually the best fit.
Compare our eight ADU models or book a factory tour to see our panels being made in Montebello.