What to Know Before Building an ADU in California

One Bed Core ADU with cream siding and string lights

An accessory dwelling unit (ADU) is a second, self-contained home on the same lot as a house, with its own entrance, kitchen and bathroom. Over the past several years California has passed a series of laws that make ADUs one of the easiest ways to add living space, rental income or a home for family. Before you start, it helps to understand what the state allows, what your city can still control, what drives cost and how long the process really takes.

What counts as an ADU

An ADU can be detached (a separate building in your backyard), attached to your house, or created inside existing space like a garage. California also allows a junior ADU (JADU) of up to 500 sq ft inside the main house. Every BOSS model is a detached ADU, delivered as factory-built steel panels and assembled on your lot.

What California law guarantees

State law sets a floor that every city has to meet. The details can change, and your city’s rules still matter, but in most cases:

  • Cities must allow a detached ADU of at least 800 sq ft with 4-foot side and rear setbacks.
  • There is no minimum lot size for an ADU.
  • Qualifying applications must be approved ministerially, with no public hearing or neighbor sign-off, and cities must act on a complete application within 60 days.
  • Owner-occupancy is no longer required for ADUs.
  • ADUs under 750 sq ft are exempt from impact fees.
  • Replacement parking is generally not required when a garage is converted, and many ADUs near transit need no new parking.

Coastal zones, very high fire hazard zones, historic districts and easements can add requirements. That’s one reason we start every project with a feasibility study for your exact address.

Why 750 sq ft matters

Because impact fees are waived for ADUs under 750 sq ft of livable space, that size is a sweet spot for many homeowners. All three of our two-bedroom models (Two Bed Basic, Two Bed Core and Two Bed Plus) are designed at 749 sq ft, so you get two bedrooms without triggering impact fees on the unit.

What an ADU really costs

The number you see advertised is rarely the whole story. A complete ADU budget usually has three parts:

  • The building, delivered and assembled. Our published prices range from $99,404 for the 220 sq ft Studio Core to $350,408 for the 1,180 sq ft Three Bed Core, and include a standard slab foundation, delivery, assembly and permit management.
  • City and utility fees, such as permit, plan check and school fees, plus utility connection charges. These vary by city and we pass them through at cost.
  • Site-specific work, like grading, trenching long utility runs, tree removal or upgrading an electrical panel or sewer line.

A feasibility study turns those unknowns into real numbers for your property before you commit. See what our feasibility study covers.

How long it takes

With a traditional build, many ADUs take a year or more from design to move-in. With BOSS, most homeowners move in about 3–6 months after the first call:

  • Feasibility study: 1–2 weeks
  • Design and permitting: 1–3 months, depending on your city
  • Site prep and manufacturing, at the same time: about 1 month
  • Delivery and assembly on site: 2–4 weeks
  • Final inspection and move-in: about 2 weeks

Permit review is the biggest variable, which is why we prepare and submit the permit package for you.

Choosing how to build

You have three main options: a conventional builder who frames the ADU piece by piece in your yard, a prefab company that cranes a finished box onto your lot, or a panelized system like BOSS, where the walls and roof are built in a factory and assembled on site without a crane. Panelized construction combines factory quality with the flexibility to fit tight or hard-to-reach backyards. Read our side-by-side comparison of factory-built and stick-built ADUs for details.

Questions to ask before you start

  • How will you use the ADU: rental, family, office or guest space?
  • How much of your yard do you want to keep?
  • Do you have access for delivery, even if it’s a narrow side yard?
  • Is your electrical panel and sewer line sized for a second home?
  • What is your all-in budget, including fees and site work?

Next steps

If you’re ready to find out what fits on your lot, start with a $1,000 feasibility study, which is credited toward your ADU if you move forward and refunded if you don’t. Or browse our eight ADU models and book a free consultation with our team.

This article is general information, not legal advice. ADU rules change and vary by city, so confirm the requirements for your property before you build.